Intellisteel’s methodology has established industry leadership and proven value in our steel framing projects around the globe. Our projects are expertly executed with precision, speed, and cost efficiency that can be utilized in avariety of manufacturing processes including modular, off-site manufacturing, and our mobile,on-site manufacturing each delivering unmatched speed, cost and efficiencies as compare to todays traditional constitution methods.

It has been an honor to collaborate with our owners and developers to create noteworthy and resilient projects that will last a lifetime and beyond. Please take a moment to review a selected few from our portfolio that provide a glimpse into our cutting-edge processes.

PROVIDENCE ONE

ON-SITE MANUFACTURING & PANELIZATION

Project Type

• Assited Living Facility & Memory Care
• 3 Story – AL
• 2 Story – Mc

Time

• 17 Weeks to Manufacture,
Panelize, & Assemble
• 22 Week Schedule

Size

• 131,000 sf Entire Superstructure

Location

• Delray Beach, Florida.

Project resulted in 7 figure savings for owners cost to build.

PROVIDENCE ONE

ON-SITE MANUFACTURING & PANELIZATION

Project Type

• Assited Living Facility & Memory Care
• 3 Store – AL
• Single-Story – Mc

Time

• 13.5 Weeks to Manufacture,
Panelize, & Assemble
• 18 Week Schedule

Size

• 113,000 sf Entire Superstructure

Location

• Kissimmee, Florida.

Project resulted in 7 figure savings for owners cost to build.

OLSON DEVELOPMENT

ON-SITE MANUFACTURING & PANELIZATION

Project Type

• Memory Care Facility
• Single-Story

Time

• 9 Weeks to Manufacture,
Panelize, & Assemble
• 12 Week Schedule

Size

• 60,000 sf Entire Superstructure

Location

• Wildwood, Florida.

Ahead of time delivery, 1st of 2 contracted projects by same owner.

OLSON DEVELOPMENT

ON-SITE MANUFACTURING & PANELIZATION

Project Type

• Memory Care Facility

Time

• 6 Weeks to Manufacture,
Panelize, & Assemble
• 12 Week Schedule

Size

• 60,000 sf Entire Superstructure

Location

• Melbourne, Florida.

Ahead of time delivery, 2nd project by same owner.

RESIDENTIAL

OFF-SITE MANUFACTURING

McIntosh

• 1,985 sf
• 1.5 Weeks

Bennet

• 2,045 sf
• 1.5 Week to Manufacture, Panelize,
& Assemble

Bohdi Residence

• 1,298 sf
• 1 Week
• Sol Foundation

Location

• Abaco Islands, Bahamas.

Each Designed & Engineered to withstand 220 mph hurricane force winds.

AMY ROBERTS PRIMARY SCHOOL

OFF-SITE MANUFACTURING

Project Type

• Green Turtle Cay Foundation
• Island’s Primary School & Designated
Hurricane Shelter

Time

• 2 Weeks to manufacture, Panelize,
& Assemble

Size

• 6,998 sf

Location

• Abaco Islands, Bahamas.

Designated Hurricane Shelter for the Abaco Islands. Designed & Engineered to 220mph.

GREEN TURTLE CAY WAREHOUSE

ON-SITE MANUFACTURING & PANELIZATION

Project Type

• Warehouse

Time

• 1 Week to Manufacture, Panelize,
& Assemble

Size

• 2,400 sf

Location

• Abaco Islands, Bahamas.

LAURENTIUS TRUSS PROJECT

OFF-SITE MANUFACTURING & PANELIZATION

Project Type

• Truss Replacement

Time

• 5 Days to Manufacture, Panelize,
& Assemble

Size

• 1,546 sf

Location

• Naples, Florida.

Post Hurricane Maria Condominium High Rise Truss Replacement.

BEAUFORT PROJECT

ON-SITE MANUFACTURING & PANELIZATION

Project Type

• Assisted Living Facility

Time

• 4.5 Weeks to manufacture,
Panelize, & Assemble

Size

• 94,450 GSF
(Only CFS interior/exterior walls
provided)

Location

• Naples, Florida.

MODULAR RESIDENCES

AUXILLARY DWELLING UNITS (A.D.U.)

Project Type

• (2) ADU Prototypes (Auxillary Dwelling Units)
• Multi-National Client Prototypes

Method

• 100% Turn-Key Volumetric
Modular
• Manufactured in Intellisteel
Factory

Size

• (1) 473 sf A.D.U.
• (1) 574 sf A.D.U.
• Planned for 200+ Units
per year

Uses

• Studios
• Residential
• Buid-to-rent (B.T.R.)
• Flats
• In-Law Suites

Location

• Palo Alto,
California.

Selected as exclusive design/engineering/manufacturing partner for national corporate initiative.

MILITARY BARRACKS

OFF-SITE MANUFACTURING & PANELIZATION

Project Type

• Troop Housing Prototype

Method

• Volumetric Modular
• Modular
• Manufactured in Intellisteel
Factory

Size

• 9,000 sf
• 10 Units @ 8’ x 40’ Individual
Modular Units
• 30 Units in Total

Uses

• Troop Housing
• Medical Clinics
• Administrative

Location

• Undisclosed.

Design/engineering/construction of innovative troop housing prototype for upcoming 7-unit project.